Projects / Municipal Solid Waste Management
Preparation of detailed design for the Temporary facility in Beit Lahia for Medical Waste Treatment
- Client / financing
- United Nations Development Programme (UNDP)
- Location
- Palestine
- Dates
- 2020
The project involved the preparation of detailed design drawings and full tender documents for a medical waste facility using a microwave treatment process to treat up to 1200 kg /day of infectious medical waste. The project consisted of Steel shed with an area of about 300 m2 to be constructed in Jabalia as a temporary site.


