Detailed Design and supervision of a 300 kWp solar system for Al quds Hospital – PRCS

Client / financing
Palestine Red Crescent Society (PRCS)
Location
Palestine
Dates
2022–2023
Renewable EnergyHealth FacilitiesElectrical Power Supply, Transmission and Distribution

Project Overview

This project involved the design and construction supervision of a 300 kWp hybrid solar PV energy system for Al Quds Hospital in Tal Al Hawa. The system was aimed at providing a sustainable energy solution for the hospital, reducing reliance on the grid, and ensuring reliable power supply for critical hospital operations.

Role of CEP in the project

Developed the detailed design for the 300 kWp hybrid solar PV system, ensuring the system met the hospital’s energy demands and integrated efficiently with existing infrastructure.

Prepared complete construction drawings, technical specifications, and cost estimates for the solar system.

Provided construction supervision to ensure the installation adhered to the approved design, safety standards, and operational requirements.

Oversaw the integration of the hybrid system, including both solar power generation and battery storage solutions, ensuring reliable and uninterrupted power supply to the hospital.

Coordinated with stakeholders to ensure the project met both technical and sustainability goals, aligning with Al Quds Hospital’s long-term energy strategy.