Projects / Renewable Energy
Design review of 65 KWp solar energy system for Al Qatari Well in Al Nasser Municipality
- Client / financing
- DEUTSCHE GESELLSCHAFT FÜR INTERNATIONALE ZUSAMMENARBEIT GMBH (GIZ)
- Location
- Palestine
- Dates
- 2019
Project Overview
This project focused on providing a solar energy system for an existing water well with a capacity of 65 kWp in Al Nasser Municipality. The consultant’s role was to review the design, quality, and compliance of the draft planning, design, drawings, and tender documents for the project, ensuring that the proposed system would meet technical, environmental, and operational standards.
Role of CEP in the project
Conducted a comprehensive review of the draft planning, design, and drawings for the 65 kWp solar energy system, ensuring they met the required technical and safety standards.
Evaluated the quality and compliance of the tender documents, ensuring clarity, accuracy, and suitability for the project's scope and objectives.
Provided recommendations for design improvements and modifications, ensuring the solar system would operate efficiently and reliably at the Al Qatari Well.
Collaborated with the client and stakeholders to ensure the proposed system aligned with project goals and environmental requirements.
