Projects / Water Supply, Transmission and Distribution
Maintenance and Rehabilitation of Water Networks in Al Zana Neighborhood at Bani Suhaila, Khan Younis-Gaza Strip
- Client / financing
- American Near East Refugee Aid (ANERA) Financed through United States Agency for International Development (USAID)
- Location
- Palestine
- Dates
- 2015
Project Overview
This project involved the maintenance and rehabilitation of approximately 13 km of water networks in the Al Zana Neighborhood, Bani Suhaila, Khan Younis. The scope included the preparation of detailed design drawings, tender documents, and technical specifications to guide the rehabilitation and ensure the water supply infrastructure met local standards.
Role of CEP on the Project:
Prepared detailed design drawings and tender documents for the rehabilitation of 13 km of water networks in Al Zana Neighborhood.
Developed a complete list of materials required for the project, ensuring compliance with project specifications and standards.
Conducted an Environmental Impact Assessment (EIA) to evaluate the potential environmental impacts and recommend mitigation strategies.
Prepared a cost estimate to ensure the project stayed within budget and met financial requirements.

