Maintenance and Rehabilitation of Water Networks at Khoza'a area in Khan Younis -Gaza Strip
- Client / financing
- American Near East Refugee Aid (ANERA) Financed through United States Agency for International Development (USAID)
- Location
- Palestine
- Dates
- 2015
Project Overview
This project aimed at the maintenance and rehabilitation of water networks in the Khoza'a area, Khan Younis. The project involved the preparation of detailed design drawings and tender documents, along with other supporting documentation to guide the rehabilitation process and ensure that the water infrastructure met quality standards.
Role of CEP on the Project:
Prepared detailed design drawings and tender documents for the rehabilitation of 8.1 km of water networks in Khoza’a area.
Developed a complete list of materials for the project, ensuring proper procurement and resource management.
Conducted an Environmental Impact Assessment (EIA) to assess potential environmental impacts and propose mitigation strategies.
Prepared a cost estimate to ensure project costs were aligned with the budget and financial requirements.