Re-design of Amer Pumping Station

Client / financing
Palestinian Water Authority (PWA)
Location
Palestine
Dates
2010
Sewage Collection, Transmission, Treatment, Disposal and Reuse

Project Overview

This project involved the re-design of the Amer Pumping Station and all associated works, prompted by the relocation of the pump. The aim was to ensure that the new pump location would maintain or improve the efficiency and capacity of the pumping station, addressing any logistical and technical challenges arising from the relocation.

Role of CEP in the project

Re-designed the Amer Pumping Station, ensuring the new pump location integrated seamlessly with the existing infrastructure.

Updated the technical specifications and system layout to accommodate the new pump placement, ensuring continued operational efficiency.

Provided detailed drawings and construction documents for the relocation and associated works.

Collaborated with relevant stakeholders to ensure the re-design met all operational, regulatory, and environmental requirements.